Update #11.01 - April 2011 - Mitigating Deicer Induced Distress Potential A Revision of an Interim Procedure
Update #10.01 - April 2010 - Plate Dowels - An Innovation Driven by Industrial Concrete Paving
Update #9.02 - August 2008 - An Alternative to Traditional Round Dowel Bars - Plate Dowel Innovations Driven by Industrial Concrete Paving (Discontinued; replaced by R&T Update #10.01)
Update #9.01 - April 2008 - StreetPave’s Equivalent Design of Asphalt - Proof of the Accuracy of StreetPave’s Asphalt Module
Update #8.04 - September 2007 - The Joint Slap Effect: Results from the Purdue Tire Pavement Test Apparatus (TPTA)
and Discussion of Preliminary Field Validation Testing
Update #8.03 - May 2007 - Caltrans Diamond Grooving Experiment – 38 Years Later
Update #8.02 - April 2007 - Current Perspectives on Pavement Surface Characteristics
Update #8.01 - February 2007 - The New Concrete Pavement Preservation Approach
Update #7.06 - October 2006 - Rules of Thumb on Pavement Noise
Update #7.05 - August 2006 - Optimizing Concrete Pavements
Update #7.04 - August 2006 - Quieting Concrete Pavement Through Surface Texture Design and Modification
Update #7.03 - August 2006 - Concrete Mixes and Pavement Construction of Aircraft Deicing Facilities
Update #7.02 - April 2006 - 2005 ACPA Profiler Repeatability Tests: Manufacturers Continue to Improve Profiler Technology
Update #7.01 - January 2006 - Diamond Grinding Shines in California and Missouri
Update #6.01 - January 2005 - Dowel Basket Tie Wires: Leaving Them Intact Does Not Affect Pavement Performance
Update #6.02 - April 2005 - Making the Grade: Grade Preparation is Important in Achieving Pavement Performance
Update #6.03 - June 2005 - Concrete Roundabouts: Rigid Pavement Well-Suited to Increasingly Popular Intersection Type
Update #6.04 - September 2005 - Alkali-Silica Reaction: Old Issue, New Cause -Interim Procedure for Screening and Mitigation of ASR Accelerated by Airfield Pavement Deicers for New Concrete Pavement Construction
Update #5.01 - January 2004 - Repeatability Testing of a Modified Ames LISA Profiler for Use on Tined Concrete
Update #5.02 - February 2004 - ACPA Reports Highlights of 83rd Annual TRB Meeting
Update #5.03 - March 2004 - Incorporating Colored Crosswalks in Concrete Pavements
Update #5.04 - April 2004 - Clay Ball Prevention and Repair: Stockpile Management is Key
Update #5.05 - June 2004 - Minimize Wheel Slap: Keep Your Joints Narrow
Update #5.06 - August 2004 - Cause, Prevention, and Repair of Longitudinal Shear Cracking
Update #4.01 - February 2003 - ACPA Reports Highlights of 82nd Annual TRB Meeting - Part 1: Maintenance and Rehabilitation
Update #4.02 - February 2003 - ACPA Reports Highlights of 82nd Annual TRB Meeting - Part 2: Design, Materials, Construction
Update #4.03 - March 2003 - Slag Cement and Concrete Pavements
Update #4.04 - April 2003 - How to Handle Rained-On Concrete Pavements
Update #4.05 - May 2003 - Air Content and Concrete Pavements
Update #4.06 - June 2003 - UTW Scores a Million
Update #4.07 - July 2003 - What To Do When Faced With Early-Age Cracking
Update #4.08 - August 2003 - Coarse-Textured Pavements and Lightweight Profilers: Part 1
Update #4.09 - September 2003 - Coarse-Textured Pavements and Lightweight Profilers: Part 2
Update #4.10 - November 2003 - Fiber Reinforced Concrete Pavements
Update #3.01 - January 2002 - An Evaluation of Jointed Plain and Jointed Reinforced Concrete Pavements
Update #3.02 - February 2002 - Factors for Pavement Rehabilitation Strategy Selection
Update #3.03 - April 2002 - Current and Recently Completed NCHRP Projects Related to Concrete Pavements
Update #3.04 - May 2002 - Updated List of UTW Projects Through 2001
Update #3.05 - June 2002 - Albedo: A Measure of Pavement Surface Reflectance
Update #3.06 - July 2002 - Stabilized Subbases and Airfield Concrete Pavement Cracking
Update #3.07 - August 2002 - The International Roughness Index (IRI): What is it? How is it measured? What do you need to know about it?
Update #2.01 - January 2001 - ACPA Offers Special Report on Texturing
Update #2.02 - January 2001 - ACPA Develops Publication on Repair of UTW
Update #2.03 - January 2001 - ACPA Report to Members: TRB 80th Annual Meeting
Update #2.04 - January 2001 - "Get In, Get Out, and Stay Out!" [Traffic Management Handbook]
Update #2.05 - March 2001 - New Special Report Compares Pavement Performance on I-15 in Utah
Update #2.06 - April 2001 - Creating a New Generation of Concrete Pavement: Progress on ACPA's Research Agenda
Update #2.07 - April 2001 - Does Diamond Grinding Affect the Structural Capacity and Service Life of Concrete Pavements?
Update #2.08 - April 2001 - LTPP Study Shows the Effects of Sealed vs. Unsealed Joints
Update #2.09 - May 2001 - New Updated Concrete Pavement Rehabilitation Guide
Update #2.10 - May 2001 - IPRF Produces Video on Repair of UTW
Update #2.11 - June 2001 - New Special Report Summarizes and Compares Pavement Performance on I-40 in Oklahoma
Update #2.12 - June 2001 - IPRF Releases First "Research Reports & Findings CD"
Update #2.13 - August 2001 - IPRF Completes Research on Weekend Reconstruction of I-10
Update #2.14- September 2001 - Updated List of UTW Projects Through 2000
Update #2.15 - October 2001 - 7th International Conference on Concrete Pavements
Update #1.01 - July 2000 - The IPRF: Who We Are and What We're Doing
Update #1.02 - August 2000 - Life-Cycle Cost Studies: Determining the Real Facts
Update #1.03 - August 2000 - The IPRF Demonstrates Ultra-Thin Whitetopping Repair
Update #1.04 - September 2000 - ACPA Offers New Concrete Pavement Restoration Binder
Update #1.05 - September 2000 - Ultra-Thin Whitetopping Design Aid Now Available on the Internet
Update #1.06 - September 2000 - Updated List of UTW Projects Through 1999
Update #1.07 - October 2000 - ACPA Offers New Technical Bulletin on Diamond Grinding
Update #1.08 - October 2000 - ACPA Formulates Paper on Asset Management
Update #1.09 - November 2000 - LTPP Study Shows Effects of Design Features on Joint Faulting
|